水性环氧地坪施工案例

宣布日期:2018-06-27 阅读次数:71

“无端方不成周遭”,世上的工作呢大略都是如斯。对工程来讲甚么才是它们的端方?是流程。对水性环氧地坪的施工流程,你又晓得几多呢?咱们起首要把施工所需的东西筹办好,以防止在施工进程中忙乱。在施工进程中首要用到的东西有:地板打磨机、搅拌机、刷子、吸尘机器、刮刀或是锯齿状镘刀另有消泡辊子等。东西筹办好后就起头施工了。到这里,水性环氧地坪的施工就实现了。可是在施工实现今后的24小时,能够穿软底鞋进入,48小时今后能力够普通操纵。并且一周内不能打仗水、油、碱酸、硅等化学物。上述的题目虽小但必然要注重,不然会给前期的操纵形成不须要的费事。

"No rules, no circles." This is almost the same thing in the world. What are their rules for engineering? They are processes. How much do you know about the construction process of waterborne epoxy floor? First of all, we should prepare the tools needed for construction, so as to avoid panic in the construction process. In the construction process, the main tools used are: floor grinder, mixer, brush, vacuum cleaner, scraper or serrated trowel, defoaming rollers and so on. When the tools are ready, construction begins. Here, the construction of waterborne epoxy floor is completed. But 24 hours after the completion of the construction, you can wear soft soles to enter, 48 hours before normal use. And within a week can not contact water, oil, alkaline acid, silicon and other chemicals. Although the above problems are small, we must pay attention to them, otherwise they will cause unnecessary trouble for later use.第一步:环氧底涂施工

First step: epoxy primer construction

将水性底涂固化剂与水性底漆主剂按分量比3:1停止夹杂,夹杂后用电动搅拌机搅拌平均,而后按1:1的比例加水停止分配,充实搅拌平均,今后接纳滚涂或喷涂停止涂装。

The water-borne primer curing agent and the main agent of the water-borne primer are mixed at a weight ratio of 3:1. After mixing, they are evenly stirred by an electric mixer. Then water is added at a ratio of 1:1 to mix them well and evenly. Then they are coated by rolling or spraying.

水性环氧夹杂好的资料最幸亏40分钟内操纵完,涂装时涂装时要做到薄而均,涂布后外表有光芒,不光芒的处所在恰当的时辰要停止补涂。比及水性底涂干了今后就能够停止中涂层的施工了。

Water-borne epoxy mixed material is best used in 40 minutes. When painting, it should be thin and uniform. After coating, the surface is glossy. Where there is no gloss, it should be repaired at the appropriate time. When the water-based base coating is dry, the construction of the intermediate coating can be carried out. 

第二步:中涂沙浆层施工

Step 2: Construction of Middle-coated Mortar Layer

先把水性中涂固化剂和水性环氧中涂主剂按分量比3:1停止夹杂,用电动搅拌机搅拌平均,而后插手30%-40%的水充实搅拌,再插手适当的石英砂停止搅拌。

Firstly, water-borne curing agent and water-borne epoxy main agent were mixed at a weight ratio of 3:1, and evenly stirred by electric mixer. Then, 30% - 40% water was added to mix fully, and then a proper amount of quartz sand was added to mix.

在这些都实现后将获得的资料倒在地上用镘刀停止批涂,批涂时尽可能防止刀痕的呈现。资料最幸亏30分钟内用完。比及中涂层沙浆层枯燥今后,就能够停止中涂腻子层的施工。

After these are completed, the obtained materials are poured onto the ground and batched with a trowel to avoid the occurrence of knife marks. Material should be used up in 30 minutes. After the middle coated mortar layer is dried, the middle coated putty layer can be constructed.

第三步:中涂腻子层施工

Step 3: Construction of Middle-coated Putty Layer

这一步的施工和中涂沙浆层的施工是一样的。

The construction of this step is the same as that of medium-coated mortar layer.

比及涂腻子层枯燥后,用磨光机停止打磨,使空中平坦滑腻。打磨好今后,要记得用扫把或吸尘器起码清算两遍。

Wait until the putty layer is dried and polished with a polisher to smooth the ground. After polishing, remember to clean it at least twice with a broom or vacuum cleaner

第四步:面漆施工

Step 4: Topcoat construction

先将水性环氧面漆固化剂和水性环氧面漆主剂按分量比4:1停止夹杂,停止搅拌,今后再插手20%的水停止搅拌。

The curing agent of waterborne epoxy topcoat and the main agent of waterborne epoxy topcoat were mixed at a weight ratio of 4:1 to stir, then 20% water was added to stir.

搅拌今后,用刮涂的体例停止施工,比及空中枯燥后再用滚涂或喷涂的体例进施工。

After mixing, the construction is carried out by scraping, and after the ground is dried, the construction is carried out by rolling or spraying.