环氧地坪夏季施工注重及施工前的斟酌身分

宣布日期:2018-09-13 阅读次数:28

的施工注重事变良多,究竟成果要到达抱负的成果,就哟啊注重良多小细节,所以若是在夏季遏制施工,就加倍要注重了,这些最幸亏是施工前就要有所斟酌。那末,夏季环氧地坪施工时要注重甚么题目呢?施工前须要斟酌甚么身分呢?夏季的施工注重:

There are many matters needing attention in the construction of epoxy flooring. After all, in order to achieve the desired results, we should pay attention to many small details. Therefore, if we carry out the construction of epoxy flooring in winter, we should pay more attention to them, which should be considered before the construction. So, what problems should we pay attention to during the construction of epoxy flooring in winter? What factors should be considered before construction? Attention should be paid to the construction of epoxy floor in winter. 1、减慢涂料反映,双组分的涂料施工,须要现场将甲、乙组分按比例夹杂,搅拌平均,让双组分充实反映,如许能力保障的结果。但若是温度低于5℃,反映将会下降或减缓,这会严峻影响地坪涂料的固化机能。

1. Slow down the reaction of the coating and the construction of the two-component floor coating. It is necessary to mix the A and B components proportionally on the spot, mix evenly, and make the two components react fully, so as to ensure the effect of the floor. However, if the temperature is lower than 5 C, the reaction will be reduced or slowed down, which will seriously affect the curing performance of floor coatings.

2、黏度成倍增添,无溶剂的自流平涂料靠流平性保障地坪的平坦度。但低温下,地坪涂料的黏度会成倍增添,流平机能将下降。而不靠流平性的涂料,刮涂时会因为活动、流平机能变差,而呈现镘刀痕的缺点。

2. Viscosity increases exponentially. Solvent-free self-leveling coating guarantees the leveling of the floor by leveling. However, at low temperatures, the viscosity of floor coatings will be doubled and the leveling performance will be reduced. However, without leveling coating, the defect of trowel marks will appear when scratching because of the poor flow and leveling performance.

3、下降涂膜品质,因为固化反映减慢,或实现不能固化,涂膜的强度、硬度、耐磨性都将会下降,并且会更轻易呈现地坪离开等题目,严峻的影响的操纵寿命。

3. To reduce the quality of the coating, the strength, hardness and wear resistance of the coating will be reduced due to the slow curing reaction or the failure of curing, and it will be more prone to problems such as floor detachment, which will seriously affect the service life of the epoxy floor.

4、夏季环氧地坪施工,最幸亏室内施工,室内温度相对室外温度较高,比拟轻易撑控,如:翻开暖气等装备增添室内温度,从而到达施工杰出结果。

4. The construction of epoxy floor in winter is better in indoor construction. The indoor temperature is higher than the outdoor temperature. It is easier to support and control. For example, opening the heating and other equipment to increase the indoor temperature, so as to achieve good construction results.

5、夏季施工,为领会决在低温下黏度大,缺少活动性难搅拌,可增加小于5%的挥发速度较快的3溶剂。

5. During the construction of epoxy floor paint in winter, in order to solve the problem that epoxy floor paint has high viscosity at low temperature and lacks fluidity and is difficult to mix, 3 solvents with a faster volatilization rate of less than 5% can be added.

6、夏季环氧地坪漆施工,因为气漫低下所形成,以致于环氧地坪漆施工的距离须要耽误,要肯定漆已干透能力施工第二道漆。

6. During the construction of epoxy floor paint in winter, the air diffuse is so low that the construction interval of epoxy floor paint needs to be extended. It is necessary to make sure that the paint has been dried thoroughly before the second paint can be constructed.

7、夏季施工时,必然要避开低温时段,最幸亏白天的上午10点至下战书3点内施工,低温时段遏制施工,削减低温对施工品质的影响。

7. During the construction of epoxy floor paint in winter, it is necessary to avoid the low temperature period. It is better to construct the epoxy floor paint in the daytime from 10 a.m. to 3 p.m. and stop the construction in the low temperature period so as to reduce the influence of low temperature on the construction quality of epoxy floor paint.

8、夏季环氧地坪施工中,每道地坪漆的厚薄度必然要掌控好,不要过于厚,越厚越难干。

8. In the construction of epoxy floor in winter, the thickness of each floor paint must be well controlled, not too thick, the thicker the harder to dry.


环氧地坪施工前要斟酌的身分:

The factors to be considered before construction of epoxy floor are as follows:

1、空中是否是知足环氧地坪漆施工前提

1. Whether the ground meets the construction conditions of epoxy floor paint

有些处所并不是你觉的能够施工环氧地坪漆就能够施工的,后期须要地坪漆厂家颠末空中勘察,检测空中的含水率、平坦度、现有空中的强度硬度等。对空中含水率高于6%的要遏制排水措置,平坦度不够的须要打磨措置,起砂起灰很是严峻的则倡议从头做混凝土,而后能力施工环氧地坪漆。

Some places are not what you think can be constructed epoxy floor paint can be constructed, early need floor paint manufacturers through ground survey, testing the moisture content of the ground, smoothness, strength and hardness of the existing ground. For surface water content higher than 6%, drainage treatment should be carried out, flatness is not enough to need polishing treatment, sand and ashing is very serious, it is suggested that concrete be made again, and then epoxy floor paint can be constructed.

2、是否是能用环氧地坪漆

2. Can epoxy floor paint be used?

对能够操纵环氧地坪漆的空中要挑选操纵合适的地坪资料,挑选合适的能够防止良多内在身分。环氧地坪漆厂家倡议对请求干净水平高的场合能够挑选。

For the ground which can use epoxy floor paint, we should choose the suitable floor material and choose the suitable floor material, which can avoid many external factors. The epoxy floor paint manufacturer suggests that the epoxy self-leveling floor can be chosen for the occasions requiring high cleanliness.

对空中只是请求防尘走人的能够挑选经济适用的环氧平涂地坪,对空中请求耐磨抗压且有叉车行走的倡议挑选环氧沙浆地坪,如果请求具备防静电的就能够够操纵环氧。

For the ground, only the economical and practical epoxy flat-coated floor is required. For the ground, the suggestion of wear-resisting and pressure-resisting and forklift walking is to choose the epoxy mortar floor. If the anti-static floor is required, the anti-static epoxy floor can be used.

3、现场情况是否是知足施工请求

3. Whether the site environment meets the construction requirements

操纵环氧地坪涂料施工实现须要时辰固化成型,所以对温度湿度都有严酷请求,温渡过高太低,湿渡过大等情况都要恰当的延缓施工,防止因这个题目而致使地坪品质题目,牢记不可在温度湿度前提不许可的情况为了赶工期硬要施工。

It takes time to solidify and form the epoxy floor coatings, so there are strict requirements for temperature and humidity. If the temperature is too high or too low, and the humidity is too high, the construction should be delayed properly, so as to avoid the quality problems caused by this problem. Keep in mind that the conditions of temperature and humidity are not allowed, in order to catch up with the construction period. Construction is needed.

别的,施工现场须要做好封锁办理,防止尘埃杂物落在漆膜外表,影响环氧地坪漆施工结果。

In addition, the construction site needs to do a good job of closed management, to avoid dust and sundries falling on the surface of the paint film, affecting the construction effect of epoxy floor paint.

4、做完环氧地坪漆后的养护任务

4. Maintenance after finishing epoxy floor paint

做完无锡环氧地坪漆后普通不能当即投入操纵,须要养护7天,在养护时代,应防止水或别的溶液浸润外表。

After finishing the epoxy floor paint, it can not be put into use immediately. It needs to be maintained for 7 days. During the maintenance period, water or other solution should be avoided to infiltrate the surface.